UGRD_2010_Spring_Baker_Baumann_Leriger_Morrison_Schulte.pdf (731.54 kB)
Download file

Automated Wood Briquette Feed System for a GARN® Wood Fired Hydronic Furnace

Download (731.54 kB)
presentation
posted on 2021-11-15, 18:39 authored by Jared Baker, Jeffrey Baumann, Michael Leriger, Andrew Morrison, Brandon Schulte
GARN® Wood Fired Hydronic Furnaces are currently used at the Ucross Foundation near Ucross, Wyoming. These GARN® units burn wood to heat a water reservoir, which through a heat exchanger, heats a water-glycol mixture then used to heat the Ucross Foundation buildings. Currently the GARN® heaters must be manually loaded with split wood as often as every 90 minutes to maintain a water temperature above 120˚F; otherwise a backup propane heating system starts. Our senior design project involved designing an automated wood fuel feed system for the GARN® furnaces which will drastically reduce the number of labor hours currently needed to stoke the stove. This project includes a storage container for wood briquettes of various sizes which will automatically be transported and launched into the GARN® combustion chamber through an automated door. Our automated feed system will run unattended for the desired run time of 96 hours while maintaining the water reservoir temperature above 120˚F to minimize or eliminate the use of the backup propane heating system.

History

Advisor

Walrath, David Coon, Dennis

ISO

eng

Language

English

Publisher

University of Wyoming. Libraries

Department

  • Library Sciences - LIBS

Usage metrics

Keywords

Licence

Exports