IMAGE
DOCUMENT
1/1
Automated Wood Briquette Feed System for a GARN® Wood Fired Hydronic Furnace
presentation
posted on 2014-07-21, 00:00 authored by Jared Baker, Jeffrey Baumann, Michael Leriger, Andrew Morrison, Brandon SchulteGARN® Wood Fired Hydronic Furnaces are currently used at the Ucross Foundation near Ucross, Wyoming. These GARN® units burn wood to heat a water reservoir, which through a heat exchanger, heats a water-glycol mixture then used to heat the Ucross Foundation buildings. Currently the GARN® heaters must be manually loaded with split wood as often as every 90 minutes to maintain a water temperature above 120˚F; otherwise a backup propane heating system starts. Our senior design project involved designing an automated wood fuel feed system for the GARN® furnaces which will drastically reduce the number of labor hours currently needed to stoke the stove. This project includes a storage container for wood briquettes of various sizes which will automatically be transported and launched into the GARN® combustion chamber through an automated door. Our automated feed system will run unattended for the desired run time of 96 hours while maintaining the water reservoir temperature above 120˚F to minimize or eliminate the use of the backup propane heating system.